The 'Ground Floor' phase (storey 0, ground level) must precede the 'Structure' phase (storey 1, first floor) — lower storeys before upper. Corrected chain: Foundations → Ground Floor → Structure → Roof → Openings → Finishes Ground Floor: Mar 12–Apr 1 (walls Mar 12–18, slab Mar 19–25, windows Mar 26–Apr 1) Structure (first floor walls): Apr 2–17 Roof: Apr 20–24 Openings: Apr 27–29 Finishes (F&F + landscaping): Apr 30–May 5 Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>